Safety operation instruction for thermal power ded

2022-10-14
  • Detail

Work scope: 1 2 2 2 dedusting fan and 1 2 dedusting area

5. Operating equipment and tools: 1 2 2 dedusting fan; One big broom, one small broom, one shovel

VI. work content: operation, spot inspection and monitoring of the equipment; Sanitation cleaning and maintenance in the area

VII. Safety operation standard:

1 Wear the labor protection articles for the post as required, and the buttons of the work clothes must be buttoned from bottom to top, and the chest and back must not be exposed; 2. Do not wear winter clothes or cotton padded clothes with long hem in winter; 3. When checking the equipment, it is strictly forbidden to be close to the running part, and the sanitation of the rotating part must be carried out under the shutdown state

1. Because the work clothes are not buckled or the hem of the coat is too long, it is brought in by the rotating part of the belt. 2 When checking the equipment, the clothes are accidentally involved by the rotating parts

1. Wear the labor protection articles for the post as required, and the top button of the work clothes must be buttoned from bottom to top, and the chest and back must not be exposed 2 Do not wear winter clothes or cotton padded clothes with long hem in winter; 3. When checking the equipment, it is strictly forbidden to be close to the running part, and the sanitation of the rotating part must be carried out under the shutdown state

1. Check whether all parts of the dust removal fan are normal, whether the cooling water is unblocked, and whether the maintenance manhole is closed; 2. Check whether there are sundries in the electric field, and pick them out immediately if any; 3. Check whether the manhole door of the dust collector is closed and whether there are people or other sundries in the rectifier room. 4. Check and adjust the high-voltage rectifier device

1. Check whether all parts of the dust removal fan are normal, whether the cooling water is unblocked, and whether the maintenance manhole

is closed; 2. Check whether there are sundries in the electric field, and pick them out immediately if any; 3. Check whether the manhole door of the dust collector is closed and whether there are people or other sundries in the rectifier room. 4. Check and adjust the high-voltage rectifier device

1. The work before operation is completed, all safety measures are perfect, and relevant personnel have been in place; 2. Each heater shall be put into operation at least 8 hours before starting to ensure the dryness of the ash hopper and all insulators (insulating porcelain bushing, electromagnetic rotating shaft) and prevent any damage caused by condensation and leakage. Check whether the current of each heating system is normal; 3. Open the Wind Damper on the inlet and outlet flue (excluding the inlet and outlet together with the flue); 4. Start the fan; 5. Preheat the electric field and steam to eliminate the moisture on the internal parts of the electrostatic precipitator. The preheating time depends on the temperature and humidity of the gas in the electric field. Generally, the temperature at the outlet of the final electric field can reach above the dew point; 6. Start the ash discharge system; 7. Start all rapping mechanisms; 8. Start all functions of the rapping system to make the alarm and safety interlock, temperature measurement and temperature control device, ash level detection and ash discharge and conveying in a controllable operation state

1. The work before operation is completed, all safety measures are perfect, and relevant personnel have been in place; 2. Each heater shall be put into operation at least 8 hours before starting to ensure the dryness of the ash hopper and all insulators (insulating porcelain bushing, electromagnetic rotating shaft) and prevent any damage caused by condensation and leakage. Check whether the current of each heating system is normal; 3. Open the Wind Damper on the inlet and outlet flue (excluding the inlet and outlet together with the flue); 4. Start the fan; 5. Preheat the electric field and steam to eliminate the moisture on the internal parts of the electrostatic precipitator. The preheating time depends on the temperature and humidity of the gas in the electric field. Generally, the temperature at the outlet of the final electric field can reach above the dew point; 6. Start the ash discharge system; 7. Start all rapping mechanisms; 8. Start all functions of the rapping system to make the alarm and safety interlock, temperature measurement and temperature control device, ash level detection and ash discharge and conveying in a controllable operation state

1. Temporary shutdown:

⑴ turn off all fans and wait for 3-5 minutes; ⑵ turn off the high-voltage power supply of each power supply unit according to the electric field sequence, and lock the high-voltage control cabinet; (3) close all dampers in the inlet and outlet flue

⑷ let the rapping system and heating system continue to operate in the suspension phase; (5) if it is necessary for personnel to enter the electric field for maintenance, the high-voltage parts should be grounded, the anode and cathode should be vibrated and stopped, and they can enter only after they wear protective clothing and low-voltage lighting after cooling in the electric field

2. Long term shutdown:

⑴ complete steps ⑴ ~ ⑶ required for temporary shutdown; (2) cut off the high-voltage disconnector of each power supply unit, turn it to the grounding position and lock it; (3) turn off all heating systems, temperature measurement and temperature control systems and ash level control systems; (4) the rapping system and ash discharge system will continue to operate after the high-voltage power supply is cut off until all soot is removed from the electrostatic precipitator; (5) cut off the main power switch (excluding the lighting circuit); (6) Building petroleum asphalt gb494 ⑴ 998 close all manhole doors after maintenance

1. Temporary shutdown:

⑴ turn off all fans and wait for 3-5 minutes; ⑵ turn off the high-voltage power supply of each power supply unit according to the electric field sequence, and lock the high-voltage control cabinet; (3) close all dampers in the inlet and outlet flue

⑷ let the rapping system and heating system continue to operate in the known suspension phase; (5) if it is necessary for personnel to enter the electric field for maintenance, the high-voltage parts should be grounded, the anode and cathode should be vibrated and stopped, and they can enter only after wearing protective clothing and lighting after cooling in the electric field

2. Long term shutdown:

⑴ complete steps ⑴ ~ ⑶ required for temporary shutdown; (2) cut off the high-voltage disconnector of each power supply unit, turn it to the grounding position and lock it; (3) turn off all heating systems, temperature measurement and temperature control systems and ash level control systems; (4) the rapping system and ash discharge system will continue to operate after the high-voltage power supply is cut off until all soot is removed from the electrostatic precipitator; (5) cut off the main power switch (excluding the lighting circuit); (6) Close all manhole doors after maintenance

1. First turn all switches to zero position and hang tags; 2. Close the inlet valve after the dedusting induced draft fan stops stably; 3. Inform the electricity department to check and handle

1. First turn all switches to zero position and hang tags; 2. Close the inlet valve after the dedusting induced draft fan stops stably; 3. Inform the electricity department to check and handle

1. Confirm that all switches are set to zero and listed; 2. Inform electrician of electric field grounding discharge; 3. Close the inlet valve of induced draft fan; 4. Open the manhole of the electric field for ventilation and cooling; (it must be more than 4 hours) 5. Before entering the electric field, the electrician should confirm the grounding condition of the electric field; 6. Confirm the CO concentration of the electric field before entering the electric field; (less than 30 mg/m3) 7. No single person is allowed to enter the electric field for operation; 8. The voltage of temporary lighting is below 36V; 9 at the same time, hang warning signs before entering the electric field, and assign special personnel to monitor; 10. Wear anti-static clothes when entering the electric field; 11. It is forbidden to work in the electric field on rainy days

1. The switch is not set to zero position and is not listed; 2. Ungrounded discharge of electric field; 3. CO concentration is not confirmed before entering the electric field; 4. Temporary low-voltage lighting is not used in the electric field, and one person works without special supervision; 5. Do not wear anti-static clothes when entering the electric field; 6. Electric field operation of electrostatic precipitator in rainy weather

1. Confirm that all switches are set to zero and listed; 2. Inform electrician of electric field grounding discharge; 3. Close the inlet valve of induced draft fan; 4. Open the manhole of the electric field for ventilation and cooling; (it must be more than 4 hours) 5. Before entering the electric field, the electrician should confirm the grounding condition of the electric field; 6. Confirm the CO concentration of the electric field before entering the electric field; (less than 30 mg/m3) 7. No single person is allowed to enter the electric field for operation; 8. The voltage of temporary lighting is below 36V; 9. Hang warning signs before entering the electric field, and assign special personnel to monitor; 10. Wear anti-static clothes when entering the electric field; 11. It is forbidden to work in the electric field on rainy days

1. The operator's hand is stabbed due to unqualified tools. 2. The body is too close to the running part when cleaning; 3. Do not wear dust masks when cleaning

1. Prepare iron ladders, test electric pens and bulbs; 2. Report to the main control room and contact the mutual insurance personnel; 3. After confirming that the lamp cap is dead, unscrew the lamp cap and replace it with a new bulb; 4. Set up ladders under high wall lighting; 5. One person escalator, one person climb; 6. After confirming that the lamp cap is dead, unscrew the lamp cap and replace it with a new bulb; (if the bulb is broken and the lamp cap is left in the lamp holder, it will be handled by the electrician)

1. There is no operation plan, safety measures and tools and instruments that do not meet the safety requirements; 2. Unattended, 3. Oil, water or sticky materials are not confirmed and removed at the foot. 4. Whether the test pencil is reliable and flexible is not confirmed before operation; 5. Special tools are not used; 6. Replace the old bulb and throw it everywhere; 7. Improper connection and replacement of bulbs; 8. Before operation, the ladder was not checked for opening, that is, it was welded and broken on the basis of different fixtures; 9. Unmanned escalator or escalator people answer; 10. The lower corner of the escalator is not fixed

1. Prepare the iron ladder, test the electric pen and light bulb; 2. Report to the main control room and contact the mutual insurance personnel; 3. After confirming that the lamp cap is dead, unscrew the lamp cap and replace it with a new bulb; 4. Set up ladders under high wall lighting; 5. One person escalator, one person climb; 6. After confirming that the lamp cap is dead, unscrew the lamp cap and replace it with a new bulb; (if the bulb is broken and the lamp cap is left in the lamp holder, it shall be handled by the electrician)